AMERICAN BUILT. PROJECT READY.MANUFACTURER DIRECT (951) 403-5738
Three switchgear cabinets on pallets, with the left cabinet door open.

PRODUCTS / VIRGINIA & NATIONWIDE

Open Transition Transfer Switches

New American-built power distribution equipment, engineered around your project.

ENGINEERED FOR POWER
US
Made in the USAAmerican components
✓
Project-specific standardsConfirmed for equipment type
↗
Built to moveLead time quoted by project

PRODUCTS / MANUFACTURER DIRECT

Open-transition transfer switches move a load between normal and alternate sources using break-before-make operation: the first connection opens before the second closes. That brief separation interrupts power, so the practical question is whether connected equipment can tolerate the transfer interval or needs a different arrangement. Switchgear Builder Virginia can develop custom new-equipment scopes around project requirements, with direct USA manufacturing, all-American components, short lead times subject to quote, and nationwide shipping. Confirm the source characteristics, load behavior, timing, controls, and required ratings before selecting an arrangement; schedules and ratings require project-specific verification.

Break Before Make

In open-transition operation, the transfer mechanism disconnects the load from one source before connecting it to the other. The sources are not intentionally paralleled during the transfer, but the load experiences an interruption while contacts move and the control sequence proceeds. Its duration depends on the selected equipment, sensing logic, operating conditions, and sequence settings; do not assume one standard interval from the phrase “open transition.” Identify whether transfer is initiated by source failure, a control command, or another defined condition, then establish which loads can ride through the interruption. Motors may coast down, control systems may reset, and sensitive electronics may require separate evaluation. The project team should review actual load response and manufacturer documentation rather than infer suitability from nominal voltage or switch ampere rating alone. State the intended sequence clearly in the specification and review it against the connected equipment.

Source and Load Data

Begin with the electrical facts for both sources: nominal voltage, phase, frequency, available fault-current information, grounding arrangement, and whether each source is independently suitable for the intended load. Provide the normal and alternate source ratings and describe any generator or upstream protection coordination requirements for review. For the load, list continuous demand, expected starting or inrush behavior, major motor loads, and equipment that cannot tolerate a brief loss of power. Clarify whether the transfer switch serves an entire distribution section or selected circuits, and identify downstream distribution equipment within the project boundary. These details help determine the appropriate transfer equipment configuration and what must be coordinated with the switchboard or upstream gear. Ratings are project-specific and must be verified against drawings, source data, applicable requirements, and the final equipment scope before they are treated as selected.

Timing and Sequence

A useful timing requirement describes the desired sequence, not just a single number. Specify what event starts transfer, how source availability is recognized, whether an intentional delay is needed, and what should happen when normal power returns. Generator applications may require coordination between source startup, transfer, and retransfer; the generator controls and switch controls must be reviewed together. State whether return to normal should occur automatically or require an authorized control action, and identify any desired cooldown sequence for the alternate source. Exact delays and operating behavior depend on the selected device, application, and approved settings, so values should be confirmed during design rather than assumed from a generic product description. Ask the project team to document acceptable interruption expectations and review the proposed sequence with the equipment suppliers and responsible electrical professionals.

Controls and Indication

Controls determine how the switch responds to source conditions and how operators understand its state. Specify the required control power source, source-failure sensing, transfer and retransfer logic, and any remote status points needed by a building control or alarm system. Identify which indications matter, such as source available, switch position, or an active transfer condition, and confirm whether local operator controls are required. If the application needs testing or exercise functions, describe the intended operating procedure and confirm the feature and its effects with the equipment supplier. Do not assume that communications protocols, contacts, bypass features, or control options are included as standard; define and verify them in the quoted scope. Controls should support the required sequence without creating ambiguous commands, and control wiring interfaces should be coordinated with the project drawings.

Scope and Verification

Before requesting a quote, assemble one coordinated package: one-line diagram, source and load schedules, available fault-current data, preferred transfer sequence, control interface list, installation constraints, and any required documentation or inspection criteria. Identify the intended equipment boundary so responsibilities for upstream protection, downstream distribution, field wiring, and controls are clear. Ask which ratings, construction details, options, and applicable approvals are included in the proposed scope, and request confirmation against the project specifications. Switchgear Builder Virginia supplies new, custom-built equipment, manufactured directly in the USA with all-American components; lead time and nationwide shipping are subject to quote and project verification. Review submittals before release, particularly source compatibility, load interruption expectations, interfaces, and selected ratings. Final acceptance requirements, inspections, and tests should be established for the specific project and confirmed by the responsible parties.

Related project guides

START A CONVERSATION

Let’s build the right solution.

Tell us what you’re building, replacing or upgrading. Share the information you have now; project details and availability can be confirmed together.

PREFER TO TALK?

(951) 403-5738

Virginia projects. Nationwide delivery.

This attempts to open a draft in your configured email app; review and send it there. Browser support varies. For immediate assistance, call (951) 403-5738.

Request a quote