What Fault Information Is Needed?

New American-built power distribution equipment, engineered around your project.

ENGINEERED FOR POWER
US
Made in the USAAmerican components
✓
Project-specific standardsConfirmed for equipment type
↗
Built to moveLead time quoted by project

FAQ / MANUFACTURER DIRECT

For a new switchgear quote, fault information helps determine whether proposed equipment and protective devices suit the electrical system at the point of installation. Switchgear Builder Virginia can use available project documents to develop a custom build, but the electrical engineer or utility must establish or confirm project inputs. Send the information you have, identify its source and date, and flag anything still pending so assumptions can be reviewed before equipment details are finalized.

Available Fault Current

Provide the available fault current at the switchgear’s installation point, along with the voltage and system configuration used for that value. If the information comes from a short-circuit study, include the relevant one-line diagram and study pages, or identify the study revision and date. A value from a different point in the system may not represent conditions at the equipment, so identify the location clearly. Also note whether the figure is expressed as symmetrical RMS current and whether peak or asymmetrical information is included, if shown in the study. Do not estimate or substitute a building service size for fault current. If the value is unknown, mark it as pending and ask the project electrical engineer or utility to determine the appropriate input. This gives the quote a traceable basis and helps avoid treating an unverified assumption as a requirement.

Source and System Details

Fault current depends on the source and the electrical path to the equipment. Helpful project documents may identify utility source data, transformer kVA and impedance, conductor lengths and sizes, and upstream system configuration. Provide only the records available; the electrical engineer determines which details are relevant and resolves missing or conflicting data. If the switchgear is downstream of a transformer, identify the transformer serving it and its location relative to the equipment. For a project with generators, parallel sources, or other operating configurations, share the documented modes that the engineer has considered rather than assuming one condition is controlling. These details can affect the study result, but a manufacturer should not infer the project’s fault current from partial nameplate data. Label each document with its revision when possible, so the design team can distinguish current inputs from older drawings or preliminary values.

Protective-Device Information

Send schedules or drawings that identify relevant upstream and downstream protective devices, including device type, manufacturer and model when known, frame or sensor information, trip settings if established, and interrupting rating shown on the documentation. Include fuse class and rating where fuses are specified. The engineer may also need time-current curves or coordination-study information to evaluate how devices interact; include those records if they are part of the project package. Do not assume a device’s interrupting rating is the same as the available fault current, or that a rating alone establishes a suitable combination. The engineer and equipment supplier can review the proposed arrangement against applicable project requirements and manufacturer documentation. If devices are not yet selected, mark them as pending rather than presenting a placeholder as final. That makes the status of the design inputs plain during quotation and submittal review.

What to Send for a Quote

A useful starting package is the latest one-line diagram, available fault-current study data at the switchgear location, protective-device schedule, transformer information, and project voltage and system details. Include the equipment location within the electrical distribution path and identify the intended application, such as service entrance or distribution, if specified by the engineer. Note which documents are preliminary and list unanswered questions, including any requested fault-current value that has not yet been supplied. Switchgear Builder Virginia manufactures new switchgear and can use customer-provided project requirements to quote a custom build; scope, ratings, schedule and configuration remain subject to review and quote. For applicable low-voltage switchboards, UL 891 assemblies may be considered when the project requires them, subject to confirmation of applicability and configuration. Do not treat that standard as a medium- or high-voltage rating.

Confirm Before Finalizing

Before equipment ratings and configuration are finalized, have the project electrical engineer or utility confirm the governing fault-current information and applicable protective-device requirements. Ask the design team to reconcile discrepancies between the study, one-line diagram, equipment schedule and field records; the manufacturer should not select a controlling value by guesswork. A revision to transformer data, source configuration, conductor path or protective-device selection may warrant renewed engineering review. Provide updated documents through the project’s normal design process and identify what changed. Equipment ratings and options should be checked against the confirmed project inputs and applicable specifications, and any required inspection, testing, approval or listing should be stated and verified for the actual assembly. This review keeps responsibilities clear: the engineer or utility establishes project inputs, while the manufacturer uses the accepted requirements to develop the quoted new equipment.

Related project guides

START A CONVERSATION

Let’s build the right solution.

Tell us what you’re building, replacing or upgrading. Share the information you have now; project details and availability can be confirmed together.

PREFER TO TALK?

(951) 403-5738

Virginia projects. Nationwide delivery.

This attempts to open a draft in your configured email app; review and send it there. Browser support varies. For immediate assistance, call (951) 403-5738.

Request a quote