Load Shedding Control Interfaces

New American-built power distribution equipment, engineered around your project.

ENGINEERED FOR POWER
US
Made in the USAAmerican components
✓
Project-specific standardsConfirmed for equipment type
↗
Built to moveLead time quoted by project

APPLICATIONS / MANUFACTURER DIRECT

Load shedding control interfaces connect a project’s load priorities to the measurements, signals, and switching actions that reduce demand when available power is constrained. The interface is not just a list of circuits: it defines what the control system observes, which loads it may affect, and how service returns afterward. Switchgear Builder Virginia can develop custom new switchgear around project requirements, with control details and applicable ratings subject to quote and verification. Buyers should coordinate the interface with the electrical engineer, controls integrator, protection designer, and equipment supplier before drawings are finalized.

Set Load Priorities

Start by separating loads that must remain energized from loads that may be interrupted, and rank the interruptible groups by operational consequence. A hospital, data facility, industrial process, or commercial building may use different criteria; those examples do not determine a project’s actual sequence. Identify critical loads, permissible interruption duration, restart constraints, and any equipment that should not return automatically. Then define whether shedding occurs by individual feeder, grouped circuits, or another approved arrangement. The switchboard lineup, feeder devices, control wiring, and available status points must support the selected scheme, subject to design review. Avoid assigning priorities from breaker size alone: the electrical rating does not express process importance. Document the owner’s operating intent and have responsible project professionals approve the priority list before translating it into control logic.

Choose Measurements

The control strategy needs an agreed basis for deciding when shedding is required. Depending on the system design, that basis could involve measured demand, generator capacity or status, utility conditions, or a signal from a separate energy-management or power-control system. Specify where each value originates, how it reaches the controller, and which party owns its configuration. Confirm measurement location and scope: a total-site value can support different decisions than a value from a particular bus or source. Establish required accuracy, update behavior, alarm handling, and what the system should do if a measurement becomes unavailable. These are project requirements, not assumed features of every switchgear assembly. Coordinate instrument transformers, meters, communications, and control-power needs with the selected equipment and control platform. Verify compatibility, ratings, and responsibilities on approved drawings and submittals before procurement.

Define Control Signals

Create a point-to-point interface schedule that names each input and output, its source and destination, normal state, electrical characteristics, and expected response. The design may use hardwired contacts, network communications, or a combination; each approach has tradeoffs in wiring, integration, diagnostics, and dependence on external devices. Do not treat a communications protocol or a dry contact as interchangeable without checking the connected equipment’s requirements. Identify signals for source availability, breaker position, shed request, shed confirmation, alarms, and any inhibit or permissive conditions needed by the approved sequence. Clarify whether controls act on breaker trip functions, shunt-trip accessories, separate relays, or another engineered mechanism; suitability depends on device design and protection coordination. The control-system integrator and switchgear designer should resolve interface ownership, fail-state behavior, and testing responsibilities in writing.

Plan Restoration Logic

Restoration deserves its own sequence rather than a simple reversal of shedding. Specify whether loads return automatically or require operator authorization, the order of restoration, delays between steps, and conditions that pause or cancel pickup. Staged return can limit sudden demand increases, but its timing must reflect the actual loads and source capability; no generic delay fits every installation. Account for motor starting, process interlocks, generator limits, and any owner-defined operating constraints through project engineering. Define what happens after a controller restart, loss of communications, or change in source status, and whether the system resumes, holds, or requests intervention. Distinguish a restoration command from proof that a breaker closed and the load resumed. Confirm status feedback and alarm expectations, then review the complete operating narrative with the owner and relevant controls and protection teams before implementation.

Verify Protection Interfaces

Load shedding changes which loads remain connected, but it does not replace overcurrent protection, source protection, or a coordinated protection study. Review the proposed control action against breaker functions, trip-unit settings, available fault information, and the system’s operating modes; project professionals must confirm applicable requirements. Establish that a shed command cannot be mistaken for a protective trip, and document how alarms, lockouts, manual controls, and failed operations are handled. Before release, check the one-line diagram, elementary and wiring diagrams, point list, control narrative, and equipment submittals for consistent device names and signal directions. Factory or field inspection and functional testing should be specified with scope, responsible parties, and acceptance criteria rather than assumed. For applicable low-voltage switchboard assemblies, UL 891 applicability and configuration require verification. Switchgear Builder Virginia manufactures new custom equipment with all-American components and nationwide shipping; schedule and ratings are confirmed through quotation and review.

Related project guides

START A CONVERSATION

Let’s build the right solution.

Tell us what you’re building, replacing or upgrading. Share the information you have now; project details and availability can be confirmed together.