Automatic Transfer Switches

New American-built power distribution equipment, engineered around your project.

ENGINEERED FOR POWER
US
Made in the USAAmerican components
✓
Project-specific standardsConfirmed for equipment type
↗
Built to moveLead time quoted by project

PRODUCTS / MANUFACTURER DIRECT

Automatic transfer switches connect a load to a selected power source and change sources when operating conditions call for it. Choosing one involves more than matching amperes: the normal and alternate sources, transfer sequence, transition method, controls, and connected equipment all affect the design. Switchgear Builder Virginia manufactures new, custom switchgear in the United States using all-American components, with nationwide shipping. For an automatic transfer switch project, confirm the required arrangement and ratings against the plans, equipment documentation, and application before requesting a quote. Availability, schedule, and final configuration depend on project review.

Define Both Sources

The normal source is the supply intended to serve the load during ordinary operation; the alternate source is the other supply available when the design calls for a transfer. Identify each source by its actual role, not simply as “utility” and “generator.” An alternate source might have different voltage, frequency, grounding, fault-current contribution, or capacity, and those differences can affect the equipment and connected loads. Clarify whether both sources can be present at the same time, how the alternate source is started or made available, and what signals indicate that either source is acceptable. Document the loads served and any priority or shedding requirements. These details help determine whether the proposed transfer arrangement matches the one-line diagram and operating plan. Source behavior and compatibility must be checked for the specific project; do not assume one standard configuration fits every installation.

Map the Transfer Sequence

A transfer sequence describes what the equipment senses and what it does next. The design may monitor source conditions, wait for an alternate source to become available, move the load, and later retransfer when normal power returns. Each step can include adjustable delays or interlocks, but their purpose and settings should be defined by the project engineer and verified for the application. Consider what should happen if the alternate source does not become acceptable, if normal power returns during a transfer, or if the load should remain on the alternate source until an operator acts. Loads with different restart behavior may need sequencing or coordination with other controls. Specify whether automatic retransfer is expected and whether a cool-down or return delay is needed. Review the complete sequence with the control diagram and operating narrative, rather than relying on a product label or assumed default behavior.

Size for the Load

Current rating is one part of selecting an automatic transfer switch, not a substitute for a full electrical review. Establish the continuous load, expected operating conditions, and any applicable short-circuit or withstand requirements from project documents. Confirm system voltage, phase, frequency, pole arrangement, neutral treatment, and the characteristics of both sources. Motor starting, transformer energization, nonlinear loads, and future expansion can affect selection; the design team should identify relevant inrush or load-step concerns. Also check that upstream protective devices and downstream equipment coordinate with the intended transfer arrangement. A nominal ampere value alone does not show that an assembly is suitable for a particular fault level, enclosure, environment, or installation. Ratings, available configurations, and application fit must be verified during quotation against the project specifications and applicable requirements. Do not infer a product rating from a general description or from the rating of adjacent switchgear.

Choose a Transition Method

Transition type describes how the load moves between sources. An open transition separates one source before connecting the other, creating a brief interruption. That break may suit many loads, but even a short interruption can reset sensitive equipment or interrupt a process. Closed transition briefly overlaps sources under controlled conditions; it may reduce the interruption, but requires careful coordination and confirmation that the sources and utility arrangement permit the overlap. Other specialized approaches may be considered where project conditions call for them. Do not select a method solely because it sounds faster or more continuous. Determine the load’s tolerance for interruption, source relationship, protection scheme, operating sequence, and any utility or facility constraints. Have the responsible engineer confirm the method and safeguards. The exact transfer behavior, controls, and permissible operating conditions are project-specific and should be documented before equipment configuration is finalized.

Verify Controls and Fit

Control compatibility is as important as the power path. Confirm the required sensing points, source-available signals, start and stop interfaces, alarms, indication, remote monitoring, and any connection to building or generator controls. Specify whether local operation or test functions are needed, and make sure the proposed interface matches the existing control architecture. Check physical fit as well: installation location, enclosure, cable entry, conductor routing, access, and environmental conditions can constrain the arrangement. For a new custom build, provide the one-line diagram, load information, source details, sequence narrative, control requirements, and applicable specifications for review. Switchgear Builder Virginia manufactures new switchgear in the United States and ships nationwide; lead time and configuration are subject to quote and verification. Final ratings, compatibility, and any required approvals or inspections must be confirmed for the actual assembly and application before release.

Related project guides

START A CONVERSATION

Let’s build the right solution.

Tell us what you’re building, replacing or upgrading. Share the information you have now; project details and availability can be confirmed together.

PREFER TO TALK?

(951) 403-5738

Virginia projects. Nationwide delivery.

This attempts to open a draft in your configured email app; review and send it there. Browser support varies. For immediate assistance, call (951) 403-5738.

Request a quote