400 A Switchgear

New American-built power distribution equipment, engineered around your project.

ENGINEERED FOR POWER
US
Made in the USAAmerican components
✓
Project-specific standardsConfirmed for equipment type
↗
Built to moveLead time quoted by project

RATINGS / MANUFACTURER DIRECT

A 400 A switchgear specification starts with the job the equipment must perform, not the number alone. Switchgear Builder Virginia builds new custom equipment for projects where 400 A may suit a service or a feeder, subject to system design and quote verification. Buyers should compare incoming conductors, available fault current, expected loads, expansion plans, and installation space before settling on a rating. These choices affect the equipment configuration and what must be confirmed with the project team.

Service or feeder?

A 400 A assembly can serve different roles, and the role shapes the specification. At a service entrance, the design must coordinate with the utility connection, grounding and bonding arrangement, protective devices, and the downstream distribution plan. As a feeder assembly, it must fit the upstream protective device and the loads it supplies. Do not treat a 400 A label as proof that either application is suitable: confirm the one-line diagram, system voltage, phase, conductor arrangement, and equipment function with the responsible electrical designer. Also identify whether the project calls for a switchboard or another equipment type; terminology alone does not establish construction or ratings. Switchgear Builder Virginia can build custom new equipment to quoted project requirements. Applicable low-voltage switchboards may be built as UL 891 assemblies; applicability and the exact configuration must be verified for the project.

Incoming conductors

Incoming cable capacity is not settled by choosing 400 A on a nameplate. The project team must specify conductor material, quantity, size, insulation, termination type, and the number and arrangement of incoming sets. Installation method, ambient conditions, conductor grouping, and applicable design requirements can affect conductor ampacity, so the cable plan needs qualified review. Confirm that the equipment’s incoming lugs and termination space can accommodate the specified conductors and bending space, and coordinate entry direction and enclosure layout with the actual room. If a project uses bus duct or another connection method, state that early rather than assuming a cable termination arrangement. These are design inputs, not universal features of every 400 A build. A clear schedule and drawings help align the quoted assembly with the intended connection, while final conductor selection and installation remain subject to project engineering and verification.

Fault duty and protection

A 400 A current rating does not establish how much short-circuit current an assembly can withstand or interrupt. Fault duty depends on the available fault current at the equipment location, the upstream source and impedance, and the protective-device arrangement. Ask the project engineer to provide the required short-circuit rating and the basis for coordination with upstream and downstream devices. Confirm that the proposed assembly and specified components are suitable for that duty as a complete configuration; do not infer fault capability from the ampere rating, enclosure size, or an individual breaker’s rating. Where an existing installation is involved, use current project documentation and qualified assessment rather than assumptions based on older labels. Switchgear Builder Virginia can review stated project requirements for a new custom build, with ratings, component choices, and applicability verified through the quote and engineering process.

Plan for future loads

Compare today’s calculated demand with credible near-term additions before deciding that 400 A is the practical choice. New machinery, tenant changes, electrification, or added distribution can change load expectations, but spare capacity should be based on documented plans rather than a vague preference for extra margin. Identify the loads, operating patterns, and likely expansion points, then ask the design team to evaluate the service or feeder accordingly. A higher nominal rating is not automatically the best answer: upstream capacity, conductors, protection, utility conditions, and the rest of the system must support the choice. A 400 A configuration might meet the defined scope, or a different rating may be warranted after review. Give the manufacturer the one-line, load information, and expansion assumptions so that proposed equipment can be matched to the intended design rather than an isolated number.

Space, scope, and quote

Room dimensions and access can narrow the options as much as electrical requirements. Record available width, height, depth, working clearances, cable entry direction, transport path, and any adjacent equipment that affects installation. Do not assume a 400 A lineup has a fixed footprint: custom configurations and component selections can change the arrangement, and final dimensions must be confirmed on project drawings. Share the intended location, environmental conditions, and connection details with the design team so they can identify questions before the equipment is released for manufacture. Switchgear Builder Virginia manufactures new custom switchgear in the USA using all-American components, with nationwide shipping and short lead times; actual schedule and configuration are subject to quote and verification, not a promised delivery date. For applicable low-voltage switchboards, UL 891 assembly requirements can be addressed when relevant and verified for the specified build.

Related project guides

START A CONVERSATION

Let’s build the right solution.

Tell us what you’re building, replacing or upgrading. Share the information you have now; project details and availability can be confirmed together.