Project-specific standardsConfirmed for equipment type
↗
Built to moveLead time quoted by project

FAQ / MANUFACTURER DIRECT

Is installation included with new switchgear? It depends on the quoted scope, not just the equipment description. A purchase may cover manufactured assemblies and shipping while leaving unloading, placement, connections, field wiring, testing, and commissioning to others—or a quote may define a broader scope. Buyers should confirm each responsibility before comparing proposals or setting a project schedule. Switchgear Builder Virginia manufactures new, custom-built equipment in the USA using all-American components, with nationwide shipping. The specific equipment, ratings, schedule, freight terms, and any field services must be confirmed in the quote. For applicable low-voltage switchboards, UL 891 requirements can be addressed as specified and verified for the assembly.

Equipment Versus Installation

A quote for new switchgear does not automatically mean the equipment will be installed at your facility. Manufacturing and installation are different scopes: one provides the specified assembly, while the other may involve receiving it, moving it into position, securing it, and coordinating site work. Ask the supplier to state clearly whether the price covers equipment only or also includes any on-site labor. If installation is not listed, do not assume it is included because delivery is arranged or the equipment is custom built. The installation plan may depend on the final design, site access, equipment dimensions, and project responsibilities. Switchgear Builder Virginia manufactures new equipment in the USA and can clarify the quoted product scope. Any installation services, personnel, schedule, and responsibilities must be explicitly confirmed in the quote rather than inferred from a product description.

Field Wiring Is Separate

Field wiring is another scope item to identify separately. Connections made at the project site may involve power conductors, control wiring, grounding, or interfaces with other equipment, but the exact work depends on the approved design and project boundaries. Ask which wiring, if any, is furnished with the assembly and which connections are expected to be completed by the electrical contractor or another qualified party. Also clarify who provides terminations, cable, routing, labels, and any required coordination documents. Factory-installed components and internal wiring do not by themselves establish that site wiring is included. Avoid relying on assumptions based on a drawing title or a general phrase such as “complete system.” The quote and approved submittals should define the boundary between equipment supplied and work performed in the field, including any exclusions that affect labor, materials, or coordination with adjacent systems.

Testing And Commissioning

Commissioning should not be presumed to come with the switchgear. Buyers should distinguish factory checks, site inspection, functional testing, startup assistance, and commissioning, because these terms can describe different activities and responsibilities. Ask what procedures are proposed, who performs them, what equipment or site conditions must be ready, and whether documentation is included. Any testing, inspection, approval, or service should be treated as conditional unless the quote expressly identifies it and confirms the applicable scope. The project team may also need to coordinate qualified personnel and follow the approved plans and applicable requirements. For applicable low-voltage switchboards, UL 891 may be relevant to the assembly; it does not, by itself, establish that field installation or commissioning is included. Request written confirmation of the exact deliverables, exclusions, prerequisites, and responsible parties before treating commissioning as part of a purchase proposal.

Freight, Receiving, And Site Access

Freight is a separate question from installation, even when a manufacturer arranges nationwide shipping. Confirm the quoted freight terms, destination, delivery method, and any responsibilities for unloading, receiving, storage, or moving the equipment from the delivery point to its final location. Do not assume a carrier will place an assembly inside a building or that site handling is included. Buyers should check likely access constraints, including doorways, routes, staging areas, and the planned handling approach, then share relevant requirements for review. Actual arrangements depend on the shipment and project conditions and should be verified in writing. A delivery estimate is not an installation commitment, and a shipping charge does not automatically cover labor at the site. Ask who coordinates delivery appointments and what happens if the site is not ready, so the project team can plan responsibilities without relying on unstated assumptions.

Get The Scope In Writing

Before placing an order, ask for a scope breakdown that identifies the supplied equipment, freight, field wiring, installation, testing, commissioning, and exclusions as separate items. Confirm which party handles each task, what information or site readiness is required, and whether any optional service has been included in the price. Compare proposals using the same boundaries; an equipment-only quote may not be directly comparable to one that includes site labor. Switchgear Builder Virginia builds custom new switchgear with short lead times, but the schedule and ratings remain subject to quote and verification, and delivery timing should not be assumed. Nationwide shipping is available, while installation or other field work should be considered included only when expressly confirmed. Clear written scope helps buyers coordinate their electrical contractor, facility team, and project schedule before equipment is ordered.

Related project guides

START A CONVERSATION

Let’s build the right solution.

Tell us what you’re building, replacing or upgrading. Share the information you have now; project details and availability can be confirmed together.

PREFER TO TALK?

(951) 403-5738

Virginia projects. Nationwide delivery.

This attempts to open a draft in your configured email app; review and send it there. Browser support varies. For immediate assistance, call (951) 403-5738.

Request a quote