Switchgear Builder Virginia designs new main-tie-main switchboards around the facility’s source arrangement, operating priorities, protection scheme and available space. For a hypothetical Norfolk waterfront facility, the design review starts with two incoming sources and a normally open tie, then documents how the system is intended to respond to source loss and restoration. Utility permission, site access and corrosion exposure require project-specific verification; waterfront location alone does not establish any particular condition. A custom build, component selection, schedule and applicable ratings are subject to quote and engineering review.

Map the sources

Begin with a one-line diagram showing each incoming source, its main device, the bus sections and the tie breaker. For the hypothetical facility, identify which loads are assigned to each section and whether either source can support the combined load during an approved transfer. That distinction affects bus sizing, device selection and operating procedures; two sources do not automatically provide full-building backup. Confirm source voltage, available fault-current information, grounding arrangement and the utility’s requirements from project documents rather than assumptions. Mark normal breaker positions clearly, with the tie shown normally open if that is the intended operating state. The diagram should also identify metering, control power and any alternate source equipment that affects transfer logic. A clear source map gives the owner, engineer and manufacturer a shared basis for reviewing continuity goals before the switchboard configuration is quoted.

Define transfer states

Specify what the equipment should do when one source becomes unavailable, how operators determine that condition, and what must happen before the tie can close. A normally open tie can permit a bus section to be supplied from the other source, but the acceptable sequence depends on the system design and source constraints. Document each main and tie breaker state for normal operation, transfer, restoration and any maintenance mode included in the project scope. Interlocks should prevent prohibited combinations, including paralleling sources unless the utility and system design explicitly permit it. Decide whether operation is manual or includes automatic controls, and identify required status indications, alarms and control power. These are design requirements to verify, not assumed standard features. A state table paired with the one-line diagram helps expose ambiguous sequences early, before they become drawing revisions or commissioning questions.

Coordinate protection

Protection decisions must account for both sources and every permitted tie position. Ask the engineer to provide available fault current and protective-device coordination requirements for each operating configuration, including the alternate feed to a bus section. Device ratings, trip functions, settings and selective coordination objectives depend on those inputs and must be reviewed for the actual system; a single-source study may not cover the tie-closed condition. Confirm how faults on each bus section are intended to be isolated and whether a source or tie breaker should trip under specific conditions. Include any required ground-fault protection, metering or arc-energy study interfaces in the project documents for review. Do not infer an assembly rating from a facility’s nominal voltage or load estimate. For applicable low-voltage switchboards, UL 891 construction may be specified subject to verification of the equipment scope and requirements; it does not apply to medium- or high-voltage switchgear.

Review the site

For a hypothetical Norfolk waterfront site, verify actual room dimensions, access route, equipment clearances, floor and anchorage requirements, ventilation and environmental conditions before fixing the lineup. Waterfront proximity may make corrosion exposure worth assessing, but the design should use documented site conditions rather than treating every waterfront building alike. Confirm whether salt-laden air, moisture, flooding risk or other contaminants are present, and specify suitable materials or protective measures only after that review. Check door openings, turning space, rigging path and the sequence for placing sections; a lineup that fits the electrical room may still be difficult to move into it. Local utility requirements, permitting and jurisdictional details must also be confirmed for the actual project. These checks can affect enclosure choices, arrangement, installation planning and schedule, so resolve them before final drawings and quotation.

Specify the new build

A useful request package includes the one-line diagram, load information, source data, protection study criteria, required operating sequence, room plan and any verified environmental constraints. Identify which details are fixed and which remain open for engineering review. Switchgear Builder Virginia manufactures new custom switchboards with direct USA manufacturing and all-American components; available configuration, components, applicable ratings and schedule are confirmed through project review and quotation. Short lead times are a company focus, not a promised delivery date. Nationwide shipping is available, with shipping and site logistics addressed for the specific order. For related context, review the Norfolk location page and the Main-Tie-Main Switchboards service information, then provide project documents through the quote request process. A complete basis of design helps the team assess the requested arrangement without assuming utility approval, site conditions or performance requirements that have not been verified.

Related project guides

START A CONVERSATION

Let’s build the right solution.

Tell us what you’re building, replacing or upgrading. Share the information you have now; project details and availability can be confirmed together.