AMERICAN BUILT. PROJECT READY.MANUFACTURER DIRECT (951) 403-5738
Gray switchgear cabinets with circuit breakers and red markings on pallets.

PRODUCTS / VIRGINIA & NATIONWIDE

Metered Switchboards

New American-built power distribution equipment, engineered around your project.

ENGINEERED FOR POWER
US
Made in the USAAmerican components
✓
UL 891 assembliesFor applicable switchboards
↗
Built to moveLead time quoted by project

PRODUCTS / MANUFACTURER DIRECT

Metered switchboards combine power distribution with measurement, but the right configuration depends on who uses the readings and what decisions those readings support. For a new project, define the metering purpose, utility requirements, equipment layout, and data connections before selecting components. Switchgear Builder Virginia manufactures custom switchboards in the USA using all-American components, with nationwide shipping. Available configurations, ratings, schedules, and applicable approvals must be confirmed against project documents and the final quote.

Revenue or operational metering

Start by identifying whether meter readings are used for utility billing, tenant allocation, energy reporting, or facility operations. Revenue metering may be subject to utility-specific equipment, accuracy, access, sealing, and approval requirements; confirm those directly with the serving utility before the switchboard design is finalized. Operational metering, by contrast, may help facility staff track loads or investigate usage, but its measurement needs and acceptance criteria can differ. A project can include both purposes, yet they should not be treated as interchangeable simply because both display electrical values. Specify who owns each meter, who reads it, what information must be recorded, and whether readings affect billing. Those answers help determine the metering arrangement and avoid designing around assumptions that later conflict with utility documents, tenant agreements, or the facility’s monitoring plan.

CT space and layout

Current transformers, or CTs, provide a way to measure current without routing the full load current through a typical meter input. Their required location and arrangement depend on the circuit being measured, the electrical design, and the utility’s requirements when revenue measurement is involved. Identify which feeders or service conductors need measurement, how many sets are required, and whether the project documents specify CT ratios or physical provisions. Then coordinate CT space with buswork, conductors, barriers, meter compartments, and access needs. Space that appears adequate on a single-line diagram may not resolve installation clearances or utility access expectations, so review the arrangement against drawings and applicable project requirements. Do not assume a standard CT compartment fits every utility or service configuration. Confirm the needed dimensions, placement, and interfaces during design review, before the switchboard layout is released for manufacture.

Accuracy and meter selection

Choose meter accuracy to suit the measurement purpose and governing project requirements, rather than selecting a specification by habit. Utility revenue applications may have defined metering equipment and accuracy criteria, while facility monitoring may prioritize useful load data, display functions, or integration with an energy platform. The applicable standard, meter model, accuracy class, and measurement range must be verified for the specific application; none should be inferred from a general product description. Also clarify what values matter: current, voltage, demand, energy, power factor, or other supported measurements. A meter’s capabilities depend on its selected model and configuration, and readings are only useful when the sensing arrangement and setup match the intended circuits. Provide the project’s meter requirements and relevant utility documents for review. Confirm compatibility, specified accuracy, and any required approval before treating a proposed meter as suitable for billing or operational use.

Communications and data

Decide whether meters need to communicate with a building management system, energy monitoring platform, utility system, or no external system. The project may call for a particular protocol, network connection, data point list, or communications interface, but compatibility depends on the selected meter and the receiving system. Specify who provides network equipment, who configures the system, and what information must be exchanged. Confirm interface type, addressing or configuration responsibilities, cybersecurity requirements, and any separation between utility and facility networks with the responsible project teams. Do not assume that a meter includes a requested protocol or that a physical connection alone ensures usable data. Include communications requirements in the equipment documents and confirm them during submittal review. For new switchboards, custom layout and component choices can be coordinated with defined project needs, subject to design review, component availability, and the final quoted scope.

Project review and configuration

Before requesting a quote, gather the one-line diagram, load and feeder schedules, utility metering standards, meter requirements, and communication specifications available for the project. Identify which details are fixed and which need engineering coordination, including service configuration, CT provisions, meter locations, enclosure requirements, and any requested data interfaces. This gives the manufacturer a clearer basis to review the proposed arrangement and identify unresolved decisions; it does not replace utility approval, engineering review, or confirmation of applicable ratings. Switchgear Builder Virginia builds new custom switchboards in the USA using all-American components and ships nationwide. Lead times, equipment ratings, applicable UL 891 assembly requirements, and other project-specific details are subject to quote and verification. UL 891 applies to applicable low-voltage switchboards only. Confirm the final scope, documents, and schedule for your project before placing an order.

Related project guides

START A CONVERSATION

Let’s build the right solution.

Tell us what you’re building, replacing or upgrading. Share the information you have now; project details and availability can be confirmed together.

PREFER TO TALK?

(951) 403-5738

Virginia projects. Nationwide delivery.

This attempts to open a draft in your configured email app; review and send it there. Browser support varies. For immediate assistance, call (951) 403-5738.

Request a quote